2890 Seven Hills Blvd., Richmond, VA 23231 | 804-226-8227 |

contact home

Products

Firetube Boilers

Features

  • Three or Four-pass wet-back or dry-back design
  • Steam or Hot water boilers 80 - 1500 HP, Pressures up to 350 Psig
  • 5 sq.ft. per BHP on standard boilers
  • Gas, oil or combination gas-oil burner
  • High turn-down and low NOx options
  • Front and rear observation ports
  • Package unit listed by Underwriters Laboratories
  • ASME Stamped pressure vessel
  • Davited/Hinged, insulated, gasket and bolted front and rear doors
  • 2" thick blanket insulation with 22 gauge galvanized sheet metal jacketing
  • Flue gas outlet can support stack up to 3,000 lbs

Photo Gallery

Click a thumbnail to enlarge.

Packaged Design

English Three or Four-pass Wet-back or dry-back design boilers can be provided either as complete shop assembled units, with or without the burner, trim or controls, for a field installation.

Long-Lasting Operation

Standard boiler design is based on 5 sq. ft. per boiler HP heating surface. Large furnace volume provides for complete combustion and optimized heat transfer. Furnace tube is positioned so as to minimize failures due to sludge buildup at the bottom of the boiler, while at the same time providing an ample water level over the furnace tube to accommodate rapid load swings.

Operation & Maintainability

No proprietary components are used in order to allow for fast and inexpensive servicing by most boiler service companies. Only name brand industry standard valves, controls, burners and flame safeguard systems are used.

Hinged or davit front and rear doors provide quick and easy access to the boiler tubes. Strategically located hand holes and a water cooled manway on wet-back designed boilers provide access to the return chamber and furnace for inspection and maintenance.

International Quality

Designed and fabricated in accordance with the guidelines of the ASME Code. All boilers are inspected by Hartford Steam Boiler Inspection and Insurance Company.

Warranty

Warranty for material and labor is 12 months from start-up or 18 months from shipment whichever comes first.