• 125,000 sq. ft. manufacturing complex with two internal rail sidings.
  • All fabrication and materials storage is under roof.
  • All membrane-to-tube welding done in-house.
  • All tube bending done in house.
  • Two CNC Drilling Machines insure accuracy, quality, and speed.
  • All tube holes are serrated as a standard.
  • All heads are SMAW welded.
  • All drums stress-relieved in house.

Onsite Staffing

  • Sales Staff
  • Project Managers
  • Engineers
  • AutoCAD/Inventor Draftsmen, Creo Elements/
    PRO E Modeling
  • Fabricators
  • Administrative Staff
  • Manufacturer’s Representative Network Provides Nationwide Coverage
English Boiler Manufacturing Facility

Contact Us

  • This field is for validation purposes and should be left unchanged.

Categories

Archives